Previous month the roof of the building was completed. This month the ceiling and outside walls have been isolated with sound isolation. Also the main cables have been drawn for power and network endpoints.
We reused wall sockets which we sprayed black so that they can be neatly built into the studio walls and ceilings.
We have placed walls for the hall, toilet, fridge, and fuse box. Besides that, all of the outside and inside doors have been put into place (not shown in the above picture).
As this month we also had our holidays scheduled so there have been no further updates. After the holidays we will continue to built the studio further with some fresh energy!
Team Real Hardstyle